Rear additions, sunrooms, garage conversions and second storey work. Zoning checked before drawings, footings below frost, roof tie ins detailed.

25+ Years in Ottawa
5.0 From 25 Google reviews
1 yr Workmanship warranty

Home additions in Ottawa start with the zoning by-law, because lot coverage and setbacks decide what will fit before design decides what looks good. Call (613) 261-4861 and we will check your address.

We build additions across the greater Ottawa area, from family room extensions in Orleans and Gloucester to second storeys on post-war bungalows closer to the core.

This page covers both home additions and room additions, since they are the same work at different scales. The engineering and the approvals are what separate them from an interior renovation.

Home Additions at a glance

Design and permit
3 to 4 months before ground breaks
Build
10 to 20 weeks depending on size
Footings
Below local frost depth
Season
Excavation once the ground has thawed

Zoning, setbacks and what will fit

Lot coverage, rear and side yard setbacks and height limits come from the City of Ottawa zoning by-law and vary street to street.

A rear addition that works comfortably on a deep suburban lot may be impossible on a narrow infill lot. Where a plan needs a minor variance that is a process with a timeline and a risk of refusal, and you should know at concept stage rather than after paying for a full drawing set.

On tight lots we look at second storey additions or interior reconfiguration as alternatives, and our design and planning consultation answers feasibility before design fees are spent.

Foundations, roof tie ins and the details that leak

New footings go below the local frost depth, and the connection between new and existing foundation gets detailed so differential settlement does not crack the join.

Where the new roof meets the old is the highest risk detail on the whole project. It needs proper valley or step flashing, membrane underneath, continuity of insulation and ventilation, and a plan for where snow will slide. Our new roof installation crew handles that junction.

Inside, the new space has to tie into the existing heating, electrical and sometimes plumbing. Load calculations for the panel and capacity checks on the furnace come before framing, not after.

Second storey additions

Adding a storey means the existing foundation and framing have to carry more load, so an engineer assesses capacity before anything is designed in detail.

It also means the roof comes off, which requires weather protection planning. We schedule those projects to get the new roof closed in before autumn, because a tarped house through an Ottawa November is not a plan.

What an addition contract includes

  • Zoning confirmation: coverage, setbacks and height for your lot.
  • Drawings and engineering: permit set plus structural details.
  • Excavation and footings: depth stated, below frost line.
  • Tie in details: foundation, roof, insulation and air barrier.
  • Mechanical capacity: heating, electrical and plumbing tie ins.
  • Weather protection: how the house is protected during the open stages.

Where home additions sits in the bigger job

This work is part of our remodeler service, so it can run on its own or as one stage inside a larger project. When it is part of a bigger renovation we sequence it with the other trades rather than treating it as a standalone visit.

Clients booking this often pair it with whole house renovation or interior renovation. One contract covers whichever combination you need, with a single schedule and one point of contact.

Home Additions across the Ottawa area

We take this work on throughout the greater Ottawa area. Recent jobs have run through Nepean, Merivale, South Keys, Kanata and the surrounding neighbourhoods. The consultation is free wherever you are in the city.

Home Additions in your neighbourhood

Pick your area for detail on the housing stock we work in there.

Home Additions Ottawa FAQ

How long before construction can start on an addition?

Plan three to four months from first meeting to breaking ground. Concepts take a few weeks, a permit set adds several more, then the City review period follows.

What is the difference between a home addition and a room addition?

Scale, mostly. A room addition adds a single space, often a family room or a bedroom. A home addition can mean a larger extension or a second storey. Both need permits, engineered structure and footings below frost.

Can I add on if my lot is small?

Sometimes, though coverage and setbacks may limit the footprint. Second storey additions and garage conversions are often the better route on tight lots, and we check zoning before promising anything.

Will the addition look like it was always there?

That is the goal, and it depends on matching rooflines, window proportions, cladding and trim details rather than just the siding colour. We design for that from the start instead of trying to disguise a box afterwards.

Book home additions in Ottawa

Call and talk to the people who will be doing the work. We look at the job, explain what is involved, and put the scope and the price in writing.

Serving the greater Ottawa area since 1999

Talk to an Ottawa renovation contractor today

Book a free consultation. We walk the space with you, talk through what the work involves, and follow up with an itemized estimate.