Prep work is what you are actually paying for
Any crew can roll a wall. The difference shows up in year three.
On interiors we fill nail pops, sand old brush marks flat, and seal water stains so they do not bleed through. Glossy trim gets scuffed or de-glossed first. Bathrooms and kitchens get a coating built for moisture, because Ottawa homes run humid in July and dry in January.
On exteriors we wash off the chalking and pollen, scrape loose film, and prime every bare spot. Caulking around windows and door casings gets replaced when it has hardened. That joint is where water gets in, and water is what pops paint off siding after a hard winter.
Why exterior paint fails early in Ottawa
Most failures we get called to fix are not product failures. They are timing failures. Paint applied in late October cures slowly, then gets hit by frost before it has hardened. It looks fine in November and peels by April.
We book exterior work between late May and early October, and we watch the overnight lows at the end of the season rather than the daytime highs.
Painting older Ottawa housing stock
Housing age changes the job. In Centretown and Sandy Hill we work on plaster walls and original wood trim, so we test for adhesion and keep sanding controlled. Homes built before 1980 may contain lead paint, so surfaces get treated carefully rather than dry sanded across a room.
West of the canal, the 1970s to 1990s stock through Nepean and along Merivale is mostly drywall with painted or stained trim. Those go faster, though popcorn ceilings and old oil-based trim still need the right primer.
Newer builds in Kanata and Orleans often arrive with builder-grade flat paint on every wall. It marks easily. When we repaint those, we usually move to a washable finish in hallways and kids' rooms.
Painting as part of a larger renovation
Most of our painting happens at the end of a bigger job. When we are already in the house as a general contractor, painting gets sequenced after the dry wall is finished and before the flooring goes down.
That order matters. Paint before flooring means no cut lines along a brand new baseboard, and no drop sheets over fresh hardwood. If you are planning a kitchen renovation or a bathroom renovation, tell us early and we will build the paint stage into the schedule.
What a painting quote from us includes
- Surfaces listed room by room: walls, ceilings, trim, doors, and closets are priced separately so nothing is assumed.
- Number of coats: stated in writing, not left vague.
- Product line and sheen: named on the estimate so you can look it up.
- Prep scope: patching, sanding, priming, and caulking spelled out.
- Protection: floor covering, furniture moving, and daily cleanup included.
- Timeline: start date, working days, and who is on site.
Colour choices that hold up in Ottawa light
Ottawa gets short, grey afternoons from November through February. Cool greys that look sharp in a showroom can read flat and cold in a north-facing Ottawa living room in January.
We are not designers, and we will not pretend otherwise. What we can do is bring samples, paint large test patches on your actual walls, and look at them with you in morning and evening light before you commit to twelve gallons.