Skip to main content
Family run renovation and construction in Ottawa since 1999
Remodeler

Whole House Renovation Ottawa | Ottawa Renovation Specialists

Every room, one schedule, one contract. Sequenced so part of the house stays livable wherever the scope allows.

25+ Years in Ottawa
5.0 From 25 Google reviews
1 yr Workmanship warranty

A whole house renovation in Ottawa succeeds or fails on sequencing rather than on finishes. Call (613) 261-4861 and we will map the order of work for your house.

We renovate entire houses across the greater Ottawa area, most often when a property changes hands after decades with one owner and needs everything at once.

This is different from a room by room approach spread over years. One contract, one schedule, and every trade booked in the right order, which is where the time and money is actually saved.

Whole House Renovation at a glance

Typical duration
8 to 16 weeks
Living on site
Sometimes, scope depending
Permits
Structural, plumbing, electrical as required
Contract
One, covering every trade

What we find when we open an entire house

Every era of Ottawa housing has its own list. Pre-war homes downtown often have knob and tube remnants, no wall insulation and cast iron drains. Post-war bungalows have undersized panels and original bathrooms.

Homes from the 1970s and 1980s generally have decent structure, with aluminum wiring in some pockets and bathroom fans venting into the attic.

A whole house renovation is the one time all of that can be fixed at once, while the walls are open and the trades are already on site. Doing it piecemeal later costs several times as much.

Sequence, and keeping the house livable

Demolition, structural framing, rough-ins, inspections, insulation and vapour barrier, board, paint, flooring, then trim and fixtures. That order is fixed, and skipping an inspection means undoing finished work.

Where the scope allows we stage the work so one bathroom and a temporary kitchen stay usable, dust barriers separate finished areas, and the walking route from the front door stays clean.

On full gut projects most clients move out for part of it, and we are honest about which weeks are genuinely unlivable rather than optimistic about it.

Where the budget actually goes

Kitchens, bathrooms and mechanical systems consume most of a whole house budget. Paint, flooring and trim are visible but comparatively cheap.

That matters when priorities have to be set. We break the estimate into stages so you can see what is structural and non negotiable, and what is a finish level decision you can adjust.

What a whole house renovation contract includes

  • Scope room by room: what is demolished, built, moved and finished.
  • Trade sequence: the order of work and roughly when each trade is on site.
  • Allowances: real numbers for tile, fixtures and cabinets.
  • Permits and engineering: listed as line items where required.
  • Change orders: written approval before any extra work proceeds.
  • Deficiency walk: list cleared before final invoicing.

Where whole house renovation sits in the bigger job

This work is part of our remodeler service, so it can run on its own or as one stage inside a larger project. When it is part of a bigger renovation we sequence it with the other trades rather than treating it as a standalone visit.

Clients booking this often pair it with home additions or interior renovation. One contract covers whichever combination you need, with a single schedule and one point of contact.

Whole House Renovation across the Ottawa area

We take this work on throughout the greater Ottawa area. Recent jobs have run through Nepean, Merivale, South Keys, Kanata and the surrounding neighbourhoods. The consultation is free wherever you are in the city.

Whole House Renovation in your neighbourhood

Pick your area for detail on the housing stock we work in there.

Whole House Renovation Ottawa FAQ

How long does a whole house renovation take in Ottawa?

Most run eight to sixteen weeks. Scope drives it more than square footage, because structural changes and new mechanical systems add inspection stages that cannot be compressed.

Do we have to move out?

For a full gut, usually for part of it. For a phased renovation we can often keep a bathroom and a temporary kitchen usable. We tell you honestly which weeks will be unlivable.

Is it cheaper to renovate everything at once?

Per room, yes, usually significantly. Setup, protection, trade mobilisation and permit costs get shared across the whole project rather than repeated for each room.

What happens if you find something unexpected?

We stop, show you, and price the fix in writing before continuing. Hidden rot, failed wiring and old drains do turn up in older Ottawa homes, and nothing gets added to your invoice without written approval.

Book whole house renovation in Ottawa

Call and talk to the people who will be doing the work. We look at the job, explain what is involved, and put the scope and the price in writing.

Serving the greater Ottawa area since 1999

Talk to an Ottawa renovation contractor today

Book a free consultation. We walk the space with you, talk through what the work involves, and follow up with an itemized estimate.

Call (613) 261-4861