Skip to main content
Family run renovation and construction in Ottawa since 1999
Building Designer

Kitchen Design Ottawa | Ottawa Renovation Specialists

Cabinet layouts, appliance placement, lighting plans and elevations, designed around how your household actually cooks.

25+ Years in Ottawa
5.0 From 25 Google reviews
1 yr Workmanship warranty

Kitchen design in Ottawa should start with how many people cook at once, not with a cabinet catalogue. Call (613) 261-4861 and we will talk about how you use the room.

We design kitchens across the greater Ottawa area and then build them, which changes how we draw. Nothing goes on a plan that our own carpenters would struggle to install properly.

The most expensive kitchen mistake is a layout error, because finishes can be changed later and a badly placed sink cannot.

Kitchen Design at a glance

Design stage
2 to 4 weeks
Deliverables
Plan, elevations, lighting, appliance list
Cabinet suppliers
Not tied to one brand
Then
Our crews build what we drew

Layout first: the work triangle and the traffic path

The relationship between sink, stove and fridge sets how the room feels to work in. Get it wrong and no amount of stone or hardware will fix it.

We also look at the traffic path, because in most Ottawa homes the kitchen is a corridor as well as a workspace. Where the fridge door lands when someone is at the sink, and whether a dishwasher door blocks the route to the back door, matter every single day.

In older bungalows the kitchen is often closed off at the back of the house. Opening it up usually means a load bearing wall and a beam, which our renovation design concepts stage prices before we detail cabinets.

Storage, lighting and the details people forget

Drawers beat doors for base cabinets almost every time, because you can see what is at the back. We plan drawer banks where the heavy items live and doors where they genuinely suit.

Most kitchens we are asked to redesign are badly underlit. One ceiling fixture is doing work that should be shared between pot lights, under cabinet task lighting and pendants over an island. Lighting gets planned on paper, with circuits noted for the electrician.

We also plan for the unglamorous things: garbage and recycling, a spot for a coffee routine, charging outlets, and where wet boots and bags land in January.

Appliance sizes before cabinet orders

Appliances have to be selected before cabinets are ordered, not after. A counter depth fridge, a slide in range and a 24 inch dishwasher all change cabinet dimensions.

We build the appliance list into the design and confirm clearances, door swings and venting routes. Getting a range hood vented properly to the outside is a detail worth insisting on in an airtight modern house.

What a kitchen design package includes

  • Measured existing kitchen: including out of square walls and floor level.
  • Floor plan options: with the work triangle and traffic path explained.
  • Elevations: every cabinet run drawn to scale.
  • Lighting and electrical plan: fixtures, circuits and switch locations.
  • Appliance schedule: sizes, clearances and venting.
  • Material and finish list: with allowances so the build cost is real.

Where kitchen design sits in the bigger job

This work is part of our building designer service, so it can run on its own or as one stage inside a larger project. When it is part of a bigger renovation we sequence it with the other trades rather than treating it as a standalone visit.

Clients booking this often pair it with custom home design or renovation design concepts. One contract covers whichever combination you need, with a single schedule and one point of contact.

Kitchen Design across the Ottawa area

We take this work on throughout the greater Ottawa area. Recent jobs have run through Nepean, Merivale, South Keys, Kanata and the surrounding neighbourhoods. The consultation is free wherever you are in the city.

Kitchen Design in your neighbourhood

Pick your area for detail on the housing stock we work in there.

Kitchen Design Ottawa FAQ

Do I need a kitchen designer if I already have a builder?

If the layout is staying identical and you are only changing finishes, probably not. If walls, plumbing or appliance positions are moving, a design stage usually saves more than it costs.

Are you tied to particular cabinet brands?

No. We work with a range of suppliers depending on budget and lead time, and we will install cabinets you have sourced yourself. Not being tied to one line means the design leads and the product follows.

How far ahead should I start designing for a spring kitchen?

Three to four months. Design takes two to four weeks, cabinet lead times can run several weeks, and the build itself is four to six. Starting in January for a May finish is comfortable, starting in April is not.

Can you design a kitchen for a condo downtown?

Yes, with the building rules factored in. Condos usually restrict plumbing stack changes and require board approval, working hour limits and elevator booking, and those constraints shape the design from the start.

Book kitchen design in Ottawa

Call and talk to the people who will be doing the work. We look at the job, explain what is involved, and put the scope and the price in writing.

Serving the greater Ottawa area since 1999

Talk to an Ottawa renovation contractor today

Book a free consultation. We walk the space with you, talk through what the work involves, and follow up with an itemized estimate.

Call (613) 261-4861