Skip to main content
Family run renovation and construction in Ottawa since 1999
Dry Wall Contractor

Dry Wall Contractor Ottawa | Ottawa Renovation Specialists

Board, tape, finish and repair, sanded flat and ready for paint. Dust controlled, corners straight, family run since 1999.

25+ Years in Ottawa
5.0 From 25 Google reviews
Dust Contained and cleaned

A dry wall contractor in Ottawa is judged under the first coat of paint, when every ridge shows. Call (613) 261-4861 and we will look at the walls.

We board and finish across the greater Ottawa area, and we have since 1999. New basements in Kanata, repairs after a burst pipe in Nepean, whole main floors in older Centretown semis where nothing is plumb.

Good drywall is flat, and flat takes coats. Rushed taping is the most common reason a fresh paint job looks disappointing in raking light.

Dry wall at a glance

Single room board and finish
3 to 5 days including drying
Basement, average size
1 to 2 weeks
Patch repairs
Often same day or next day
Coats as standard
Tape plus two, three where needed

Dry wall work we do in Ottawa

Three service lines, all done by our own crews.

Each service below has its own page with the detail on how we do it, what it costs and how long it takes. We cover drywall finishing, drywall installation and drywall repair.

01

Drywall installation

Boarding walls and ceilings on new framing, basements, additions and full gut jobs. Correct board for the location, moisture resistant in bathrooms, fire rated where a separation is required, screws set at proper spacing.

02

Drywall finishing

Tape, compound, corner bead and sanding. Tape coat plus two finish coats as standard, and a smoother finish level where walls will get strong side light or a gloss paint.

03

Drywall repair

Water damage, holes, cracked corners, popped screws, failed tape seams and textured ceiling removal. We cut back to sound board, back the patch properly, and blend the finish into the surrounding wall.

Why drywall cracks in Ottawa houses

Our humidity swing is extreme. July is humid, January is desert dry indoors once the furnace runs.

Wood framing moves with that swing, and drywall telegraphs the movement. Cracks show up at the corners of door openings, along ceiling perimeters, and above stairwells where the framing spans are longest.

Fixing a crack means addressing the joint, not smearing filler on it. We cut out failed tape, re-tape with the right compound, and feather wide enough that the repair does not read as a stripe under paint. Where movement is ongoing, we discuss a control detail rather than promising it will never return.

Basement drywall and moisture

Board goes on last in an Ottawa basement, not first. Before we board, the moisture question has to be settled: grading and downspouts outside, any foundation seepage addressed, and continuous insulation against the concrete.

Paper faced drywall installed tight against a cold, damp foundation wall is how basements grow mould behind a finished surface. We frame off the wall with insulation behind, and we keep board up off the slab.

Dust control in a lived-in house

Sanding compound produces a fine dust that travels through a whole house on the furnace fan.

We seal the work area with poly and zip doors, cover and tape return air vents, and use dust collecting sanders on larger jobs. Floors get protected, and we vacuum rather than sweep, because sweeping puts everything back in the air.

For occupied homes in Merivale or South Keys where families are working from home, we also schedule the noisy stages around calls where we can.

Older Ottawa walls: plaster, not drywall

Homes built before roughly 1950 in downtown Ottawa often have lath and plaster rather than drywall.

Plaster repair is a different craft. Sometimes the right answer is a plaster patch, sometimes it is cutting back to the studs and boarding the section, then blending the transition. We look at how much of the wall is sound and loose before recommending either.

Pre-1980 finishes may also contain asbestos in the joint compound or ceiling texture. Where that is a possibility, testing comes before demolition. We do not sand into unknown material and hope.

What a dry wall quote from us includes

  • Board type and thickness: including moisture and fire rated locations.
  • Finish level: how many coats and where extra flatness is being paid for.
  • Corner detail: metal or paper bead, plus any bullnose.
  • Dust protection: barriers, vent sealing and cleanup included.
  • Disposal: old board and offcuts removed, not left in your driveway.
  • Paint readiness: whether priming is in scope or handled by our painters.

Where dry wall sits in the schedule

Drywall goes up after framing, rough-ins and inspection, and after insulation and vapour barrier.

It comes before painting and before flooring. When we are already running the job as your general contractor, that sequencing is handled for you, and the finish gets checked under work light before the painters arrive.

Our dry wall process in Ottawa

Four stages, with drying time respected between coats.

1

Protect the space

Poly barriers, sealed vents, covered floors, and a clear path in and out.

2

Board

Correct board for each location, hung with proper fastener spacing and staggered joints.

3

Tape and coat

Tape coat, then finish coats with drying time between. Corners and butt joints get the extra attention.

4

Sand and check

Sanded flat, then inspected under raking light with you before paint goes anywhere near it.

Dry wall crews across the Ottawa area

We board and finish throughout the greater Ottawa area. Pick your neighbourhood for local detail.

Dry Wall Contractor Ottawa FAQ

Why do drywall cracks keep coming back in my Ottawa home?

Because the joint is moving, and filler alone does not fix movement. Our humidity swings between a humid July and a dry January make framing expand and contract. The repair has to remove failed tape and re-tape properly, and sometimes the framing needs attention first.

How long does drywall take to finish?

Boarding a single room is usually a day. Finishing adds three or four days because each coat has to dry before the next. Rushing that is what leaves ridges and shrinkage cracks that show up once you paint.

Can you remove a popcorn or stucco ceiling?

Yes, either by scraping and skim coating or by boarding over it. In homes built before 1980 the texture may contain asbestos, so testing comes first. We do not sand unknown material.

Will there be dust all over my house?

Not if the job is set up properly. We seal the work zone with poly, tape off return air vents, use dust collecting sanders, and vacuum rather than sweep. Most clients are surprised how contained it stays.

Do I need special drywall in a basement or bathroom?

Bathrooms need moisture resistant board, and tiled wet areas need a proper backer rather than paper faced board. Basements need insulation and an air gap behind the board. Fire rated board is required where a separation is needed, such as under a garage or in a secondary suite.

Do you paint after the drywall is finished?

Yes. Our painters take it from the sanded surface through primer and finish coats, which means one company is responsible if a seam shows later.

Need a dry wall contractor in Ottawa?

Whether it is one damaged wall or a whole basement, we will price the board, the coats and the cleanup in writing.

Dry wall across the greater Ottawa area since 1999

Talk to an Ottawa renovation contractor today

Book a free consultation. We walk the space with you, talk through what the work involves, and follow up with an itemized estimate.

Call (613) 261-4861